Archive

Northumbria Police

The Job Containerisation plays a large part in the Engineered Solutions’ problem solving process, serving multiple roles in distribution, manufacturing and storage. With an array of supporting facilities and equipment, including specialised trolleys and mobile storage units, nesting and stacking facilities, labelling and colour identification, Russian doll storage and combination stacking facilities they really do […] Read more

Feb, 05, 2015

0

SHARE THIS

Interflex Group Ltd.

The Job The normal method of storage of print cylinders that are extremely expensive and very vulnerable to damage is specially fabricated and very expensive rack manufactured from structural sections, largely sheet metal, angles and box sections. When Interflex were faced with the problem of storing these production items for a multi million pound investment […] Read more

Feb, 05, 2015

0

SHARE THIS

The Store Room

The Job The Store Room required a stackable container that could be dropped on to the ground for loading up to 5 tonnes for light domestic and commercial storage operations. Engineered Solutions were asked to find a solution that was under £100,000, quicker than a 40 minute turn round time on site and could be […] Read more

Feb, 05, 2015

0

SHARE THIS

Rework

The Job Probably one of the most expensive items of plant to the average business is its forklift truck. However, knowing the cost is completely unrelated to understanding the complexity of the value of one of the most important innovations in materials handling that has transformed beyond all recognition our ability to remove cost and […] Read more

Feb, 05, 2015

0

SHARE THIS

Wind Farm Manufacturer

The Job For wind farm manufacturers a tower up to 40m long require shot blasting prior to paint treatment. These towers are fabricated sympathetically to production efficiency which means making ahead of requirement on occasion. If stored in bad weather the towers are a water magnet, which is an issue as they must be dry […] Read more

Feb, 05, 2015

0

SHARE THIS

Alnmaritec Ltd.

The Job Alnmaritec’s rapid expansion due to offshore wind farming meant they had to respond quickly to the requirements of the energy industry with a fifteen year commitment of the various energy providers to wind farming. This was a jet propelled growth curve which required some careful planning and cost management. It was more a […] Read more

Nov, 11, 2014

0

SHARE THIS