Archive

Waitrose

The Job Engineered Solutions were called in to help Waitrose in meeting their growing demands from the e-commerce home delivery aspect of their business. The buildings that were being used to supply all the online home deliveries were built 20 years ago and just not designed to meet the new demands that home deliveries were […] Read more

Feb, 10, 2015

0

SHARE THIS

Atlas Copco

The Job Atlas Copco needed to expand their factory space in order to keep up with the increasing demands of their business. Engineered Solutions were able to assist on how to go about expanding their current factory. The Solution Rather than extending their current factory, Engineered Solutions specialists built them an industrial tent. This industrial […] Read more

Feb, 10, 2015

0

SHARE THIS

Wind Farm Manufacturer

The Job For wind farm manufacturers a tower up to 40m long require shot blasting prior to paint treatment. These towers are fabricated sympathetically to production efficiency which means making ahead of requirement on occasion. If stored in bad weather the towers are a water magnet, which is an issue as they must be dry […] Read more

Feb, 05, 2015

0

SHARE THIS

Lear Corporation

The Job From all over Europe products were entering and leaving the site at this major automotive supplier works. JIT line supply was the engaged mechanism with little room for error. This division, which had recently been acquired from another major international automotive supplier, was engaged in tense change involving significant volume improvements in productivity. […] Read more

Feb, 05, 2015

0

SHARE THIS

Costain/Severn Trent Water

The Job Costain/Severn Trent Water company was undergoing a process of refurbishment of a sewerage plant where expensive machinery was being exposed to the elements, thus shortening its efficiency and life. The vast storage tanks this station already serviced had a complicated scheme of pipes and services and it was essential that these were not […] Read more

Feb, 05, 2015

0

SHARE THIS

The Cylinder Service Centre Ltd.

The Job The Cylinder Service Centre Ltd. operations had outgrown their current premises and the customer needed to build a new industrial building for their engineering works for which they acquired a new site. The site had an illegal settlement, public rights of way, underground services and a statutory highways prohibition in place preventing the […] Read more

Nov, 25, 2014

0

SHARE THIS